Skip to content
P.P.H.U. 2A Artur Ankowski
oficjalna strona
P.P.H.U. 2A Artur Ankowski
  • Home
  • 2A
    • About us
    • Structures for industry
    • Steel halls
    • Machining
    • Mobile platforms and special vehicles
    • Privacy policy
  • Production
    • Production capacity
    • Production equipment
    • Scope of testing
    • Applied materials
  • Certificates
  • EU projects
  • News
  • Contact
  • Polski
  • English
  • Deutsch
  • Home
  • 2A
    • About us
    • Structures for industry
    • Steel halls
    • Machining
    • Mobile platforms and special vehicles
    • Privacy policy
  • Production
    • Production capacity
    • Production equipment
    • Scope of testing
    • Applied materials
  • Certificates
  • EU projects
  • News
  • Contact
  • Polski
  • English
  • Deutsch

Daily Archives: July 23, 2020

You are here:
  1. Home
  2. 2020
  3. July
  4. 23

Fabrication of the steel structure of the overhead pedestrian route with the assembly of the Kurza Góra observation tower

Bez kategoriiBy RedaktorJuly 23, 2020

Assembly of the hydrocyclone tower

Bez kategoriiBy RedaktorJuly 23, 2020

In recent weeks, we have started the assembly of the Hydrocyclone Tower for one of our clients.    

Copyright © 2020 2A. Wszelkie prawa zastrzeżone.
Go to Top
Na naszej stronie stosujemy pliki cookies w celu świadczenia Państwu usług na najwyższym poziomie, w sposób dostosowany do indywidualnych potrzeb, a także w celach statystycznych (anonimowe zliczanie liczby użytkowników). Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Państwa urządzeniu końcowym. Możecie Państwo dokonać w każdym czasie zmiany ustawień dotyczących cookies... [więcej...]